- Im using NX-9
- I want to Copy the Assembly with Wavelink(Without Broken) For the Below Assembly Structure
>Assy-1 (Contains Wavelink)
- Part-A1 (Contains Wavelinks) [(x,y,z)=(50,20,100)]
- Part-B1 (Contains Wave links of Part-A1)
- Part-C1 (Contains Wave links of Part-A1,B1)
[Now i Want to copy this assembly and rename to Assy-2]
>Assy-2 (Contains Wavelink)
- Part-A2 (Contains Wavelinks) [(x,y,z)=(70,40,100)]
- Part-B2 (Contains Wave links of Part-A2)
- Part-C2 (Contains Wave links of Part-A2,B2)
For this case,
if i'm using Make unique option and rename, i'm getting Assembly & parts with broken wavelinks.Again in again i have to use synchronize links option to generate wavelinks. It makes me tedious, Because every parts have 50-70 linked datums,curves,axis.
if i'm using Save as option, Afterwards It can't able to move the part co-ordinates(x,y,z).
Query:
Is there any better option available for Copy the assembly without wavelink broken.?