Quantcast
Channel: NX Design Forum topics
Viewing all articles
Browse latest Browse all 5175

NX MCD

$
0
0

HI EVERYONE!

 

I am getting a problem in Mechatronics Concept Designer that when I am arranging the sequence order in time based operations it is not following according to the sequence that i have given since the time box also is in checked condition.

 

i have seen the video https://youtu.be/yEdUQGzB1Ng and followed the same but the sequence is not following.. pls give some suggestions to do time based events.

 

Thanks a lot.


Viewing all articles
Browse latest Browse all 5175

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>